en:uued_varadokumendid
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
en:uued_varadokumendid [2022/04/06 14:24] – [5. Review the new documents instructions] triinp | en:uued_varadokumendid [2022/06/16 13:26] (current) – [Introduction of new Fixed and Low Value Assets] triinp | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== |
\\ | \\ | ||
\\ | \\ | ||
Line 7: | Line 7: | ||
**UPDATES** | **UPDATES** | ||
* Data is changed through additional documents - if you want to see data history in reports. | * Data is changed through additional documents - if you want to see data history in reports. | ||
- | * Fixed Assets depreciation proportion can be calculated by objects and projects. | + | * The Fixed Assets depreciation proportion can be calculated by objects and projects. |
* The Fixed Asset depreciation can be calculated up to certain date (so far it has been monthly). | * The Fixed Asset depreciation can be calculated up to certain date (so far it has been monthly). | ||
* The Fixed Assets are written-off partially (on asset change document). | * The Fixed Assets are written-off partially (on asset change document). | ||
* The quantity can only be 1 on Fixed Asset card. | * The quantity can only be 1 on Fixed Asset card. | ||
* The quantity can be bigger than 1 on Low Value Asset card. | * The quantity can be bigger than 1 on Low Value Asset card. | ||
- | * New fixed asset and low value asset documents cannot be opened from the confirmation, incl. write-off document. | + | * New fixed asset and low value asset documents cannot be opened from the confirmation. |
* Changing the financial transactions date on documents creates an inconsistency between the data in the balance sheet and the asset module. | * Changing the financial transactions date on documents creates an inconsistency between the data in the balance sheet and the asset module. | ||
+ | * Following documents cannot be opened from the confirmation | ||
+ | * The Fixed Asset change | ||
+ | * The Low Value Asset change | ||
+ | * The Fixed Asset recalculation | ||
+ | * The Asset inventory | ||
+ | * Following documents can be opened from the confirmation | ||
+ | *The Asset write-off | ||
\\ | \\ | ||
\\ | \\ | ||
Line 61: | Line 68: | ||
\\ | \\ | ||
Look instructions : \\ | Look instructions : \\ | ||
- | * [[et/osakond#aadressid|Asukohtade aadressid]] | + | * [[en/osakond#addressis|Departments addresses]] |
- | *[[en/ | + | *[[en/ |
===== 5. Review the new documents instructions ===== | ===== 5. Review the new documents instructions ===== | ||
Line 70: | Line 77: | ||
* [[en: | * [[en: | ||
* [[en: | * [[en: | ||
- | * [[et: | + | * [[en: |
- | * [[et:inv_klass|Väikevahendi muutus]] | + | * [[en:inventory_asset_change|Low value asset change]] |
- | * [[et: | + | * [[en: |
- | * [[et: | + | * [[en: |
- | * [[et: | + | * [[en: |
- | ===== 6. Vaata läbi Directo | + | ===== 6. Review the general rules for new Directo |
- | Juhendid: [[et: | + | Instructions: [[en: |
- | ===== 7. Tegemisel | + | ===== 7. Unfinished |
- | * Vara nimekiri aruandes ei ole uued seosed veel kõik lisatud | + | * Not all new links have been added to the asset list report yet |
- | * Massimport ja eksport uute väljade osas pole kõik veel valmis | + | * Not everything is ready for bulk import and export new fields |
- | * Dokumentide väljatrükke pole praegu lisatud | + | * Documents printouts are not currently included |
en/uued_varadokumendid.1649244293.txt.gz · Last modified: 2022/04/06 14:24 by triinp