User Tools

Site Tools



en:low_value_asset

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
en:low_value_asset [2022/07/04 11:29]
triinp [8.2 Detailed user management]
en:low_value_asset [2022/10/11 09:56]
triinp [3.5. Creating a low value asset card from bulk import module]
Line 247: Line 247:
  
  
-===== 4The asset card is editable =====+==== 3.6. Low value assets codes numbering ​====
  
-System settings – ''​Asset settings -> Asset card is editable''​ – NO/YESBy default the setting ​is YES \\+One or multiple low value asset codes ranges can be used for a fixed assets. 
 +  * One range is used for all fixed assets
  
-**YES** - all changes can be made directly on the asset cardbut reports for an earlier period cannot be taken later - who was in charge etc.  +If one range is in use the next range code is taken as the fixed asset codewhen creating ​the next fixed asset card.
-\\ +
-**NO** - changes can only be made on the additional documents. Changes are saved and they can be reported in the past. Option **NO** allows to make changes in fixed assets and low value assets fields, which are not closed on asset card. +
  
-If System setting ''​Asset card is editable -> NO''​ the fields below on the asset card will be locked, after depreciation has been calculated ​for the first time or another document has been issued (Change, Inventory). ​+  * Multiple ranges are used for all fixed assets
  
-Following fields ​are locked ​on the **Fixed ​asset card**:+If multiple ranges ​are in use double-click ​on the code and select the range to be used, when creating the next fixed asset card.
  
-  * Code +:!: If you want to use numbers in ranges - for example PV00001, you must add a number before the number part of the code - for example PV10001. Using the code PV00001, the program offers PV2 as the next code. If the code is PV10001, the program will offer PV10002 as the next code. 
-  * Class + 
-  * Type +===== 4. The low value asset card is editable ===== 
-  * Calculation method + 
-  * Fiscal data (all the fiscal data on asset card) +System settings – ''​Asset settings -> Asset card is editable''​ – NO/YES. By default ​the setting is YES \\ 
-  Accounts (all the accounts ​on asset card) + 
-  * Department +**YES** - all changes can be made directly ​on the low value asset card, but reports for an earlier period cannot be taken later - who was in charge etc.  
-  User +\\ 
-  ​In charge +**NO** - changes can only be made on the additional documents. Changes are saved and they can be reported in the past. Option ​**NO** allows to make changes in fixed assets and low value assets fields, which are not closed on low value asset card. 
-  ​Object +
-  ​Customer +
-  ​Project +
-  ​Proportion +
-  ​Cost object +
-  ​Cost project+
  
 +If System setting ''​Asset card is editable -> NO''​ the fields will be locked after some linked document has been created for the first time (Low Value Asset Change, Inventory). ​
  
 Following fields are locked on the **Low value asset card**: Following fields are locked on the **Low value asset card**:
en/low_value_asset.txt · Last modified: 2022/12/20 10:28 by triinp