This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
en:osakond [2022/04/18 09:05] triinp [Fields to be completed] |
en:osakond [2022/04/18 09:13] triinp [Fields to be completed] |
||
---|---|---|---|
Line 21: | Line 21: | ||
**Superior**- a superior can be assigned for a department and this value is taken into account also in the system settings "Manager can open its subordinate cards and reports with the own right". | **Superior**- a superior can be assigned for a department and this value is taken into account also in the system settings "Manager can open its subordinate cards and reports with the own right". | ||
- | **Weekday working hours**- possible to enter department-based hours by day. | + | **Weekday working hours**- possible to add department-based hours by day. |
**Work schedule items**- possible to add department-based schedule items. Standard hours are taken into account according to them, if it is not recommended that standard hours be calendar. | **Work schedule items**- possible to add department-based schedule items. Standard hours are taken into account according to them, if it is not recommended that standard hours be calendar. | ||
Line 47: | Line 47: | ||
=====Jobs===== | =====Jobs===== | ||
- | It is possible to enter to the additional table the number and fee of jobs budgeted to this department. | + | To the additional table is possible to enter the number and fee of jobs budgeted to this department. |
**Position code**- possible to choose a position from the position register | **Position code**- possible to choose a position from the position register |