User Tools

Site Tools



en:inventory_asset_change

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
en:inventory_asset_change [2022/04/04 15:34]
evelint [2.2.3. Editable fields - with the rights inventory (asset) confirm]
en:inventory_asset_change [2022/06/20 08:19]
triinp [6.1. How can I place all the LV IDs at once?]
Line 1: Line 1:
-:!: POOLELI - kasutamiseks alates 21.04.2022 !!! 
  
 ====== LOW VALUE ASSET CHANGE ====== ====== LOW VALUE ASSET CHANGE ======
 +
 +:!: The document cannot be opened from the confirmation! \\
 +:!: The Asset Card and the Low Value Asset Change document can not be used at the same time, the data does not move correctly and Directo does not correct errors due to incorrect use.\\ ​
  
 Document for changing information in the low value asset fields. Document for changing information in the low value asset fields.
Line 94: Line 96:
 {{:​et:​triinp20220329-144445.png}} {{:​et:​triinp20220329-144445.png}}
  
-Adding the right of confirm, allows to change the following fields in the Low Value Asset Change document:+Adding the right to confirm, allows to change the following fields in the Low Value Asset Change document:
  
-  ***Class** - asset class code, low value asset class and all the class accounts are placed.+  ***Class** - asset class code, low value asset class and all the accounts ​from that class are placed.
   ***Object** - object or objects   ***Object** - object or objects
   ***Project** - project   ***Project** - project
Line 102: Line 104:
  
  
-Pressing the spanner ​opens the option to add Edit fields:+Pressing the wrench ​opens the option to add Edit fields:
  
 {{:​et:​triinp20220329-150329.png}} {{:​et:​triinp20220329-150329.png}}
Line 135: Line 137:
   * Transaction is formed, entry type = INV_CHANGE.   * Transaction is formed, entry type = INV_CHANGE.
   ​   ​
-  5. The change can be opened from the confirmation if there are no subsequent transactions for the given fixed asset (change, depreciation,​ inventory, write-off, etc.)+  5. The change can be opened from the confirmation if there are no subsequent transactions for the given low value asset (change, depreciation,​ inventory, write-off, etc.)
   ​   ​
   ​   ​
Line 144: Line 146:
 {{:​et:​triinp20220329-155620.png}} {{:​et:​triinp20220329-155620.png}}
  
 +
 +===== 6. Frequently Asked Questions =====
 +
 +==== 6.1. How can I place all the LV IDs at once? ====
 +
 +If there are more than one low value assets on one low value asset card and it is necessary to place all low value assets at once:
 +  * select CODE from DOCUMENT FILLMENT filters
 +  * place CODE to low value asset cell 
 +  * press **Fill document**. ​
 +This will place all LVIDs on the document that are not currently written off. 
 +
 +{{:​et:​triinp20220620-081902.png}}
en/inventory_asset_change.txt · Last modified: 2022/11/16 11:16 by triinp