This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
en:fin_aru_pea [2022/04/25 14:34] evelint [4.3 Subtotals] |
en:fin_aru_pea [2022/04/25 14:44] evelint [4.4 Resetting balances] |
||
---|---|---|---|
Line 147: | Line 147: | ||
**Example** \\ | **Example** \\ | ||
Nominal Ledger shows project with balance: | Nominal Ledger shows project with balance: | ||
- | {{:et:triin20190523-142418.png}} | + | {{:et:evelint20220425-144133.png}} |
Picture(5) | Picture(5) | ||
Next step is to generate a report with longer period and with filters such as the ones in the picture 6. The result shows which transactions the final balance consists of. | Next step is to generate a report with longer period and with filters such as the ones in the picture 6. The result shows which transactions the final balance consists of. | ||
- | {{:et:triin20190523-150333.png}} | + | {{:et:evelint20220425-144456.png}} |
Picture(6) | Picture(6) |